For Karen & Vyvian
Highgate Hill
Budget: $70 000.00
Renovation Project

This extension first required us to demolish an existing structure then re build the extension including a new bathroom to the upper floor of this house

  • IMG_8427

  • IMG_8789

  • IMG_0319

This extension was carried out as the previous structrure was defective and had to be re built. The new bathroom and hall had various high end finishes including terrazo floor tiles, jalousie louvre windows and custom made timber joinery.